PAVERS Special Provisions
 
OWNER RESPONSIBILITIES:

1. Assumes all responsibilities for locating and marking all sub surface utilities prior to installation.
2. Provide adequate water and electricity.
3. Immediately notify us of any work or items the owner may intend to back charge us, and give us the opportunity and a reasonable amount of time to accomplish any required corrections.

SPECIAL PROVISIONS:

1. Pavers are not entirely maintenance free products. Additional sweeping of sand into the joints if required, will be responsibility of the owner after we complete the sweeping.
2. Effloresce or other paver discoloration is not within the scope of our responsibilities.
3. We are not responsible for settling due to failure of sub grade.
4. A ¼" variance in 10' is the industry standard for paver installations.
5. All work to be completed in a workman like manner, in accordance with industry standards.
6. Any deviation from above or proceeding specifications involving additional cost will only be executed upon written request at an additional charge.
7. Any requirement for sod, or other landscape activity, which may be needed, subsequently to installation is not our responsibility. This includes back filling up against the trawled concrete retaining edge.
8. Installer hereby provides a one-year warranty. All material supplied are subject to manufacturers specifications and warranty.
9. In the event the installer must pursue collection of monies owed us, relative to this project, the owner agrees to pay all reasonable costs incurred us as a result of said collection.
10. All agreements contingent upon strikes, accidents, weather, manufacturing delays and all other delays beyond our control.
11. In the event of installer not being paid in full, relative to this project, the owner agrees to the repossession of all materials installed.

Please Note: Upon order of your pavers, you will receive a certified "Notice to Owner" from the manufacturer. All this indicates is that the order has been placed. You are not liable for any payment at that time. It is a standard procedure to protect a subcontractor or supplier for the services or goods they have secured on your behalf. All subcontractors/suppliers will be paid directly by Mr. Marcite. Your payments are only due as indicated in your contract.

     STAIN
     Prep &
        Procedure

     Aftercare
     Photos

FLO-CRETE
     Prep &
        Procedure

     Aftercare
     Photos
     
PAVERS
     Prep &
        Procedure

     Special 
        Provisions

     Aftercare
     Photos
  

 

 

 
 

Home    About Us    Pools    Decks    Contact    Links 

© Copyright Mr. Marcite, Inc. 2003-2008.
All rights reserved.  No distribution of content allowed.
Site design by Pretty Jazzy Design