WHAT THE HOME OWNER CAN EXPECT
Our workmen will be at your home for several days to perform
your pool renovation. In all, you will encounter three separate
Mr. Marcite units: preparation crew, surface application crew,
and our service technician. Our crews are specialized in
separate phases of renovation to better service our customers.
FOR EACH DAY THAT MR. MARCITE IS ON SITE AT YOUR HOME,
WE REQUIRE THE FOLLOWING:
ACCESS FROM THE STREET TO YOUR POOL
A POWER SOURCE AT YOUR POOL
ACCESS TO THE ELECTRICAL BREAKERS AT YOUR HOME
(or a viable contingency for access should a
breaker trip)
ACCESS TO WATER AND
SPIGOT
A VALID CONTACT NUMBER FOR YOU
POOL PREPARATION
At this time, your pool will be drained and prepared for surface application. Your pool pump and timer will be disconnected for the duration of your renovation. If you have contracted tile work, it will be performed at this stage and may take several days to install and set-up. Please note that once preparation is complete, it is not unusual for a pool to sit open one or more days between preparation and application, depending on seasonal scheduling.
SURFACE APPLICATION
During this phase, your new pool surface will be applied and WE WILL BEGIN FILLING YOUR POOL. The
returns of your pool will be plugged to prevent water leaking
onto the surface; please do not remove these plugs as doing so
may cause staining. Remember, however, that your newly applied
surface is hand-troweled and may contain small imperfections.
This is normal of all hand-troweled applications and is
commonplace in the industry. Each pool is unique.
WHILE THE POOL IS FILLING:
1. DO NOT WALK IN OR AROUND YOUR POOL DURING FILLING
PROCESS
2. DO NOT TURN THE WATER OFF FOR ANY REASON and DO NOT ADD
CHEMICALS (Doing so may cause damage to your new
surface.) If you are concerned that the water could overflow
during the night, you can turn DOWN the water flow and slow
filling, but you must be careful not to turn the water off.
Turning the water off before the level reaches your tile may
cause a "bathtub ring" in your new surface.
3. Once the water level reaches the normal fill level,
you may turn off the water and remove the hose from the pool.
Notify the office immediately so that we can place you on the
schedule for our service technician.
SERVICE TECHNICIAN
Our service technician will collect final payment and perform
a multi-day chemical treatment of your pool. During the first
visit your pool pump will be started and will run for a 24-hour
period. DO NOT turn off your pump unless instructed by
our technician to do so. Circulation is important. Upon the next
visit, our technician will reset your pool timer, final out
chemicals and any details on your jobsite.
FROM THIS POINT ON, CARE AND MAINTENANCE OF THE POOL IS LEFT
TO THE DISCRETION OF THE POOL OWNER. YOU SHOULD BEGIN BRUSHING
YOUR POOL AS OFTEN AS POSSIBLE WITH A COMBINATION NYLON BRUSH TO
PREVENT RESIDUE FROM AFFIXING TO YOUR NEW POOL SURFACE. NOTIFY
YOUR REGULAR POOL SERVICE THAT THEY MAY RESUME, AND REFER TO THE
POOL CARE & MAINTENANCE BY POOL OWNER INFORMATION SHEET.
YOUR MR. MARCITE PRODUCT WARRANTY AND/OR WATER LETTER WILL BE
PROVIDED AFTER FINAL PAYMENT IS RECEIVED. OUR WORKMANSHIP IS
ALSO GUARANTEED BY YOUR SIGNED CONTRACT.
Depending upon individual pool renovation needs, the Florida
weather, and seasonal demands, your pool renovation time and/or
procedure may vary. If you have any concerns do not hesitate to
call our office |